All Services/SVC-004
ISO 9001 / PM Programs

Preventative Maintenance

Scheduled Service Programs to Prevent Costly Failures

Visit Frequency
Annual / semi-annual
Coverage
Multi-site
Reminders
Automated 60-day
SVC-004
Overview

Service Summary

Preventative maintenance (PM) programs combine scheduled calibration, physical inspection, transducer cleaning, mechanical adjustment, and early fault detection into a single coordinated service visit. Medology's PM programs are designed for single-site clinics and enterprise networks, reducing emergency repair frequency and extending instrument service life.

Visit Frequency
Annual / semi-annual
Coverage
Multi-site
Reminders
Automated 60-day
Reporting
Consolidated
Volume Pricing
5+ instruments
Cert. Included
Per instrument
Importance

Why It Matters

  • PM programs detect failing transducers, worn cushions, and drifting electronics before they cause out-of-tolerance readings in clinical use.

  • Scheduled service visits reduce the administrative burden of tracking individual calibration due dates across multiple instruments.

  • Enterprise clients with 50+ instruments across multiple locations save 20–35% on per-instrument service costs under volume PM agreements.

  • PM documentation provides a complete service history per instrument — essential for accreditation audits and equipment replacement justification.

Supported Equipment

Instruments & Platforms Covered

Calibration Equipment

  • Audiometers (all types)
  • Tympanometers / immittance systems
  • OAE screening systems
  • ABR / ASSR systems

Sound Environment

  • Audiometric booths
  • Sound suite electronics
  • Ambient noise monitoring systems
  • Acoustic calibrators

Newborn Screening

  • DPOAE / TEOAE screeners
  • ABR newborn screeners
  • Pass/refer tracking systems
  • Probe cleaning / maintenance

Don't see your model? Contact us — we service virtually all clinical audiology equipment.

Process

Service Workflow

01

Facility & Inventory Audit

Complete inventory of all audiology equipment, current calibration status, and service history is compiled to build the PM schedule.

One-time setup
02

Automated Scheduling & Reminders

Each instrument is entered into the PM calendar. Automated reminders are sent 60 days before each service is due.

No admin burden
03

Service Visit: Calibration + Inspection

Technician performs calibration, transducer cleaning, cushion inspection, physical wear assessment, and early-fault detection on all scheduled instruments.

Critical step
04

Consolidated Report & Certificates

A single consolidated compliance report with individual certificates for each instrument is delivered digitally after each service visit.

Audit-ready
Compliance

Standards & Regulations

PM programs are designed to maintain continuous compliance with all applicable calibration and equipment maintenance standards.

ANSI S3.6-2018Annual Calibration

ANSI S3.6 mandates annual calibration — PM programs are structured to meet or exceed this frequency requirement.

JCAHO EC.02.04.01PM Documentation

JCAHO requires documented preventative maintenance for life safety and medical equipment. PM reports satisfy this requirement.

OSHA 1910.95Occupational Programs

OSHA-mandated occupational hearing conservation programs require annual audiometer calibration — PM programs fulfill this requirement.

Each PM visit generates individual calibration certificates per instrument plus a facility-level summary report documenting overall compliance status — designed for direct submission to accreditation bodies.

FAQ

Common Questions

Have a question not answered here? Contact our team.

Ready to proceed?

Preventative Maintenance — Request Service

Submit a request online or call for immediate assistance. Certificates issued same day.